FIONA ANNIS
  • Bridge (45º 30' 38.5734" -73º 35' 27.1198")
    2 channel video installation: color, audio, 12min looped continuously
  • Bridge (45º 30' 38.5734" -73º 35' 27.1198")
    2 channel video installation: color, audio, 12min looped continuously
  • Bridge (45º 30' 38.5734" -73º 35' 27.1198")
    2 channel video installation: color, audio, 12min looped continuously

Bridge (45º 30' 38.5734" -73º 35' 27.1198")

Fiona Annis & Robin Pineda Gould
2 channel video installation: color, audio, 12min looped continuously
Exhibited at The Canadian Centre for Architecture ABC: MTL
November 13th 2012 - January 26th, 2013
Link to video


bridge
bridge
© Canadian Centre for Architecture, Montréal

Back to projects